Prosecution
21 hingga 30 daripada 2483
# | Company | Date | Category | Court | Case | Fine | State |
---|---|---|---|---|---|---|---|
21 | GREENPAPER PRODUCTS SDN.BHD. | 2025-07-23 | Manufacturing | Batu Pahat Sessions Court | Sec. 15, AKJ 1967. Failure to provide that every dangerous part of the machinery shall be securely fenced. | RM30,000 | |
22 | RAPID RAIL SDN.BHD. | 2025-07-25 | Transportation | Magistrate's Court 8 | Reg. 10(1), Factories and Machinery Regulations (NCFI) 1970, AKJ 1967. The owner of every lifting machine other than a hand-operated lifting machine fails to hold a valid certificate of qualification in respect thereof while the machinery is in use. | RM3,000 | |
23 | HIA UNION ENGINEERING SDN. BHD. | 2025-07-28 | Construction | Teluk Intan Sessions Court | Sek. 18A(1), AKKP 1994. Prinsipal gagal mengambil setakat yang boleh dipraktikkan apa-apa langkah sebagaimanan perlu untuk memastikan keselamatan dan kesihatan pekerja | RM70,000 | |
24 | TCS CONSTRUCTION SDN.BHD. | 2025-07-30 | Construction | Criminal Sessions Court 12 | Sek. 15(1), AKKP 1994. Majikan gagal untuk memastikan, setakat yang praktik, keselamatan, kesihatan dan kebajikan semasa bekerja semua pekerjanya bagi mengadakan Prosedur Kerja Selamat (PKS) bagi kerja memasang dan membuka ‘’cantilever bracket’’ sehingga menyebabkan kemalangan maut kepada pekerja. | RM35,000 | |
25 | IMPIAN MAWAR SDN. BHD. | 2025-06-04 | Construction | Kulim Sessions Court | Sec. 29(2), read with Order 3, OSH (Safety and Health Officers) Order, OSHCA 1994. Failing to employ a competent person to act as a Safety and Health Officer at the workplace. | RM8,000 | |
26 | YE CHIU NON-FERROUS METAL (M) SDN. BHD. | 2025-05-27 | Manufacturing | Johor Bahru Sessions Court | Sec. 17(1) OSHA 1994. An employer fails to ensure, so far as is practicable, the safety, health and welfare at work that he and other persons, not being his employees, who may be affected by the undertaking are not exposed to risks to their safety or health by reason of the undertaking. | RM35,000 | |
27 | JETTA CONSTRUCTION SDN. BHD | 2025-05-27 | Translation | Kulim Sessions Court | Sek. 18A(1), AKKP 1994. Prinsipal gagal mengambil setakat yang boleh dipraktikkan apa-apa langkah sebagaimanan perluu ntuk memastikan keselamatan dan kesihatan pekerja sehingga menyebabkan kemalangan maut kepada pekerja. | RM20,000 | |
28 | WULLERSDORF RESOURCES SDN. BHD. (BUKIT MANTRI GOLD MINE TAWAU) | 2025-05-28 | Mining | Tawau Sessions Court | Sek. 15(1), AKKP 1994. Majikan gagal untuk memastikan, setakat yang praktik, keselamatan, kesihatan dan kebajikan semasa bekerja semua pekerjanya bagi mengadakan Prosedur Kerja Selamat (PKS) bagi mengeluarkan batu sehingga menyebabkan kemalangan kepada pekerja. | RM30,000 | |
29 | JCT INDUSTRIES GROUP SDN. BHD. | 2025-05-29 | Manufacturing | Sungai Petani Magistrate's Court | Reg. 5(2), OSH Regulations (NADOPOD) 2004, OSH 1994. Failing to submit within seven (7) days a report of an accident or dangerous occurrence in the approved form to the OSH regarding an accident of an employee resulting in the inability to carry out his/her normal work for more than four (4) calendar days. | RM4,500 | |
30 | RANTAU BUSINESS SDN. BHD. | 2025-05-29 | Construction | Teluk Intan Sessions Court | Sek. 15(1) AKKP 1994. Majikan gagal untuk memastikan, setakat yang praktik, keselamatan, kesihatan dan kebajikan semasa bekerja semua pekerjanya bagi arahan, latihan dan penyeliaan sebagaimana yang perlu untuk memastikan setakat yang praktik, keselamatan dan kesihatan pekerjanya sehingga menyebabkan kemalangan maut kepada pekerja. | RM25,000 |