891PETROGAZ ENGINEERING SDN BHD2019-07-31ConstructionIpoh Sessions CourtSec. 10(c), AKJ 1967. Failing to ensure that every working floor for open edges is constructed safely to prevent the risk of persons falling.RM30,000SILVER
892PETROGAZ ENGINEERING SDN BHD2019-07-31ConstructionIpoh Sessions CourtReg. 5(1)(a)(aa) – OSH Regulations (NADOPOD) 2004, AKKP1994. Failed to immediately notify the nearest OSH office by the quickest means available and within 7 days to submit a report in the approved form of a fatal accident.RM5,000SILVER
893PETROGAZ ENGINEERING SDN BHD2019-07-31ConstructionIpoh Sessions CourtSec. 10(c), AKJ 1967. Failing to ensure that every working floor for open edges is constructed safely to prevent the risk of persons falling.RM30,000SILVER
894PESONA METRO SDN. BHD.2019-11-14ConstructionMagistrate's Court Three (3), Shah AlamReg. 5(1)(a)(aa) – OSH Regulations (NADOPOD) 2004, AKKP1994. Failed to immediately notify the nearest OSH office by the quickest means available and within 7 days to submit a report in the approved form of a fatal accident.RM2,000SELANGOR
895RINGLET JAYA COMPANY SDN. Ltd.2021-01-26ConstructionRaub Sessions CourtSec. 15(1), OSHA 1994. Employer failed to ensure that arrangements were made to ensure, so far as practicable, safety and the absence of risk to health in connection with the use or operation, handling, storage and transportation of plant and materials for construction including studying the stability of soil structures on hillsides in accordance with the designs of a Professional Engineer.RM20,000PAHANG
896MEKASSAR COMPANY (M) SDN. Ltd.30/4/2025ManufacturingRompin Magistrate's CourtReg. 5(2), OSH Regulations (NADOPOD) 2004, OSH 1994. Failing to submit within seven (7) days a report of an accident or dangerous occurrence in the approved form to the OSH regarding an accident of an employee resulting in the inability to carry out his/her normal work for more than four (4) calendar days.RM1,000
897MEKASSAR COMPANY (M) SDN. Ltd.2019-10-21ManufacturingKuantan Sessions CourtSec. 15(1), OSHA 1994. The employer failed to ensure, so far as is practicable, the safety, health and welfare at work of all his employees by establishing Safe Working Procedures (SWP) for the repair of derailment cages.RM15,000PAHANG
898Kosinar Enterprises Sdn Bhd2018-09-24ManufacturingKota Kinabalu Sessions CourtSection 15. AKJ 1967. Failure to install a strong fence around dangerous machineryRM10,000.00Sabah
899PERUSAHAAN KAYU PAHANG TIMUR2025-02-27ManufacturingKuantan Magistrate's CourtReg. 4(7), OSH Regulations (NE) 2019, OSH Act 1994. Employer fails to implement recommendations for any action in the noise risk assessment report.RM3,000
900KAA CONSULTING SDN BHD2019-09-11ConstructionGeorgetown Sessions CourtSec. 15(1), OSHA 1994. Employer failed to ensure, so far as practicable, the safety, health and welfare at work of all his employees in carrying out engineering calculations for temporary slopes resulting in landslides.RM40,000P.PENANG

External Links

CONTACT US

Department of Occupational Safety and Health

Level 5 (Main Counter), Setia Perkasa 4,
Setia Perkasa Complex,
Pusat Pentadbiran Kerajaan Persekutuan,
62530 Putrajaya

Tel: 03-8000 8000

Fax: 03-8889 2443

BILANGAN PELAWAT

Today: 22,516
Bulan Ini: 93,317
Jumlah: 53,480,562

Updated Date:

28 / 07 / 2025

Best viewed using Mozilla Firefox and Google Chrome browsers with a screen resolution of 1920 x 1080

Copyright Reserved 2025 © Department of Occupational Safety and Health.