{"id":5761,"date":"2025-01-19T07:41:34","date_gmt":"2025-01-19T07:41:34","guid":{"rendered":"https:\/\/dosh.gov.my\/?page_id=5761"},"modified":"2025-02-20T13:59:06","modified_gmt":"2025-02-20T13:59:06","slug":"kerja-pengorekan","status":"publish","type":"page","link":"https:\/\/dosh.gov.my\/en\/keselamatan-tapak-bina\/kerja-pengorekan\/","title":{"rendered":"Dredging Work"},"content":{"rendered":"<div class=\"wp-block-group is-vertical is-content-justification-stretch is-nowrap is-layout-flex wp-container-core-group-is-layout-0f0b95e2 wp-block-group-is-layout-flex\">\n<div class=\"wp-block-cover is-light\" style=\"border-radius:20px;padding-right:var(--wp--preset--spacing--60);padding-left:var(--wp--preset--spacing--60);min-height:50px;aspect-ratio:unset;\"><span aria-hidden=\"true\" class=\"wp-block-cover__background has-accent-5-background-color has-background-dim-0 has-background-dim\"><\/span><div class=\"wp-block-cover__inner-container is-layout-flow wp-block-cover-is-layout-flow\">\n<div class=\"wp-block-cover\" style=\"border-radius:10px;padding-right:0;padding-left:0;min-height:50px;aspect-ratio:unset;\"><span aria-hidden=\"true\" class=\"wp-block-cover__background has-background-dim-60 has-background-dim has-background-gradient has-custom-jkkp-gradient-gradient-background\"><\/span><div class=\"wp-block-cover__inner-container is-layout-flow wp-block-cover-is-layout-flow\">\n<p class=\"has-text-align-center has-large-font-size wp-block-paragraph\"><strong>Dredging Work<\/strong><\/p>\n<\/div><\/div>\n<\/div><\/div>\n\n\n\n<div class=\"wp-block-cover is-light\" style=\"border-radius:20px;padding-right:var(--wp--preset--spacing--60);padding-left:var(--wp--preset--spacing--60);min-height:50px;aspect-ratio:unset;\"><span aria-hidden=\"true\" class=\"wp-block-cover__background has-accent-4-background-color has-background-dim-0 has-background-dim\"><\/span><div class=\"wp-block-cover__inner-container is-layout-flow wp-block-cover-is-layout-flow\">\n<div class=\"wp-block-cover is-light\" style=\"border-radius:20px;box-shadow:var(--wp--preset--shadow--natural);min-height:50px;aspect-ratio:unset;\"><span aria-hidden=\"true\" class=\"wp-block-cover__background has-accent-4-background-color has-background-dim-60 has-background-dim\"><\/span><div class=\"wp-block-cover__inner-container is-layout-flow wp-block-cover-is-layout-flow\">\n<p class=\"has-text-align-left has-link-color has-small-font-size wp-elements-a963e3d0a0c429f1df7e6442a775c8fd wp-block-paragraph\"><strong>Dredging Work<\/strong><\/p>\n\n\n\n<p class=\"has-link-color has-small-font-size wp-elements-06ffd0820aab77bc5e6e7351c3b5d835 wp-block-paragraph\"><strong>1.1 What is dredging work?<\/strong><\/p>\n\n\n\n<p class=\"has-link-color has-small-font-size wp-elements-91adc9e1ecd4dd0183346ab2a0f40751 wp-block-paragraph\">Excavation is defined as the removal of soil, rock or other material in connection with construction or demolition work by using tools, machinery or explosives to form an open surface, hole or cavity. Excavation includes any earthworks, drainage, cofferdam, caisson, well, shaft, tunnel or underground working.<\/p>\n\n\n\n<p class=\"has-link-color has-small-font-size wp-elements-8457af22906940268e94ba221255847a wp-block-paragraph\">Any construction work (including any work related to excavation) carried out in or near:<\/p>\n\n\n\n<ul class=\"wp-block-list has-link-color has-small-font-size wp-elements-25f63f1212d3f953566b2f5c101bb215\">\n<li>(a) a pit, cofferdam, caisson or trench with a dredged depth exceeding 1.5 metres, or<\/li>\n\n\n\n<li>(b) a tunnel<\/li>\n<\/ul>\n\n\n\n<p class=\"has-link-color has-small-font-size wp-elements-5d6a4a6e5cd64c117ce2f2b8a1515eab wp-block-paragraph\">can be considered &#039;high-risk construction work&#039; and it is encouraged to have a safe work system or written Safe Work Method Statement (PKKS).<\/p>\n\n\n\n<p class=\"has-link-color has-small-font-size wp-elements-0a02d213e952172088f3718cd79e5a02 wp-block-paragraph\"><strong>1.2 Who has safety and health obligations in relation to dredging work?<\/strong><\/p>\n\n\n\n<p class=\"has-link-color has-small-font-size wp-elements-f0c1843a909b033a1593b061917b4266 wp-block-paragraph\"><strong>Employer<\/strong>,&nbsp;<strong>builder&nbsp;<\/strong>and&nbsp;<strong>occupant<\/strong>&nbsp;has a primary duty to ensure, so far as is reasonably practicable, that workers and other persons are not exposed to safety and health risks arising from dredging work. Duty bearers must manage the risks associated with all types of dredging at work, regardless of depth.<\/p>\n\n\n\n<p class=\"has-link-color has-small-font-size wp-elements-fecff473f5ab289bb6bd1ad387d3a282 wp-block-paragraph\"><strong>Self-employed person<\/strong>&nbsp;must ensure, so far as is reasonably practicable, that no person is exposed to safety and health risks arising from his work.<\/p>\n\n\n\n<p class=\"has-link-color has-small-font-size wp-elements-0954090ed8b9c25b831f83e304f5b64d wp-block-paragraph\"><strong>Client<\/strong>&nbsp;can make a significant contribution to improving the safety and health management of excavations by allocating an adequate budget for site investigations. They should be prepared to allocate additional financial resources for site investigations during construction if the expected soil or rock conditions, due to exposure during excavation, differ from those predicted in the original site investigation.<\/p>\n\n\n\n<p class=\"has-link-color has-small-font-size wp-elements-3acd826603fd901f3e5947284a87082e wp-block-paragraph\"><strong>Builder<\/strong>&nbsp;has a legal duty under Part XII of the Factory and Machinery (Building Operations and Engineering Construction Works) (Safety) Regulations 1986 (BOWECS) to manage the risks associated with excavation work. For example, the builder must appoint a competent person to act as a designated person (excavation supervisor) to carry out the duties under Regulation 113(2) of BOWECS. The builder must consult, so far as is reasonably practicable, the designer of the whole or any part of the structure (permanent or temporary) on the elimination and control of risks.<\/p>\n\n\n\n<p class=\"has-link-color has-small-font-size wp-elements-c0af7f18356d1367e18b8beaaaccf7c3 wp-block-paragraph\"><strong>Professional Engineer (PE)&nbsp;<\/strong>as a designer must ensure, so far as is reasonably practicable, that any plant or supporting structure designed does not present a risk to safety and health, when used for the purpose for which it was designed. For example, the PE must provide a written safety report, to the person tasked with constructing the supporting structure, setting out the methods of excavation work, the hazards associated with the design of the supporting structure and the control measures.<\/p>\n\n\n\n<p class=\"has-link-color has-small-font-size wp-elements-c9986ae5ef9314b894c32e6da2dd2219 wp-block-paragraph\"><strong>Project manager<\/strong>,&nbsp;<strong>project director<\/strong>&nbsp;or&nbsp;<strong>project engineer<\/strong>&nbsp;has a duty to use reasonable efforts to ensure that dredging operations comply with the OSHA, the OSHA and the regulations thereunder. This includes taking reasonable steps to ensure that dredging operations have and use the right resources and processes to eliminate or minimize risks arising from dredging operations.<\/p>\n\n\n\n<p class=\"has-link-color has-small-font-size wp-elements-db430d8301e2cc2682d9928a432a9e8d wp-block-paragraph\"><strong>Safety and Health Officer (SHO)<\/strong>&nbsp;must ensure due compliance during dredging work with the provisions of the OSHA and any regulations made thereunder; and promote the safe conduct of such dredging work.<\/p>\n\n\n\n<p class=\"has-link-color has-small-font-size wp-elements-fadbe5b0b806534d62ed682c9dc4ec07 wp-block-paragraph\"><strong>Site Safety Supervisor (SSS)<\/strong>&nbsp;must ensure that the provisions of the AKJ and any regulations made thereunder are complied with; and promote safe working practices particularly during excavation work and generally at construction sites.<\/p>\n\n\n\n<p class=\"has-link-color has-small-font-size wp-elements-de5209ddb9363921f6faac73daf7d1b4 wp-block-paragraph\"><strong>Employee<\/strong>&nbsp;have a duty to exercise reasonable care for their own safety and health so that they do not endanger the safety and health of others. Employees must comply with any reasonable instructions and cooperate with reasonable policies or procedures relating to safety and health at work.<\/p>\n\n\n\n<p class=\"has-link-color has-small-font-size wp-elements-71d74575ca1d3eae3d700fcd303b3374 wp-block-paragraph\"><strong>1.3 What is needed to manage the risks associated with dredging work<\/strong><\/p>\n\n\n\n<p class=\"has-link-color has-small-font-size wp-elements-42fe639115e8de5f1fef22d0b27dfb3c wp-block-paragraph\">Every employer on a construction project involving excavation work shall ensure that the risks are properly managed by establishing a safe system of work, as required under subsection 15(2)(a) of the OSH Act, concerning the general duties of employers and self-employed persons. Where a construction project involves more than one employer, all employers shall cooperate in establishing a safe system of work to protect their employees and other persons who may be affected by the risks of excavation work.<\/p>\n\n\n\n<p class=\"has-link-color has-small-font-size wp-elements-bf11ff87274f0175e960b2f070d98e04 wp-block-paragraph\"><br><strong>1.3.1 Creating a safe work system<\/strong><\/p>\n\n\n\n<p class=\"has-link-color has-small-font-size wp-elements-c03b82ab81c9c3a41402f160cac24c56 wp-block-paragraph\">A safe system of work is a formal procedure that systematically examines a work task to identify all potential hazards that may arise and then describes safe working methods, such as a safe work procedure, that ensure that hazards are eliminated and risks are minimized. A safe system of work is required when hazards cannot be physically eliminated and certain elements of risk still exist.<\/p>\n\n\n\n<p class=\"has-link-color has-small-font-size wp-elements-4c4d5f99d0956df911aa3b9f10f6f75a wp-block-paragraph\">The five steps to establishing and maintaining a safe system of work are shown in Figure 1. The person responsible for implementing a safe system of work should provide safe methods by:<\/p>\n\n\n\n<ul class=\"wp-block-list has-link-color has-small-font-size wp-elements-436630d951ee578331edb5f691ca4f8a\">\n<li>(a) considering work preparation and granting of work permits at the commencement of any work;<\/li>\n\n\n\n<li>(b) ensure clear work sequence planning;<\/li>\n\n\n\n<li>(c) determine safe working methods and necessary safety measures;<\/li>\n\n\n\n<li>(d) includes safe access methods and safe escape methods, if relevant; and<\/li>\n\n\n\n<li>(e) consider tasks such as removal and disposal of building materials at the end of each task.<\/li>\n<\/ul>\n\n\n\n<figure class=\"wp-block-image aligncenter size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"329\" height=\"304\" src=\"https:\/\/dosh.gov.my\/wp-content\/uploads\/2025\/01\/image-3.png\" alt=\"\" class=\"wp-image-6274\" srcset=\"https:\/\/dosh.gov.my\/wp-content\/uploads\/2025\/01\/image-3.png 329w, https:\/\/dosh.gov.my\/wp-content\/uploads\/2025\/01\/image-3-300x277.png 300w, https:\/\/dosh.gov.my\/wp-content\/uploads\/2025\/01\/image-3-13x12.png 13w\" sizes=\"auto, (max-width: 329px) 100vw, 329px\" \/><\/figure>\n\n\n\n<p class=\"has-text-align-center has-link-color has-small-font-size wp-elements-8073dd4a68c105420867bdc685186edb wp-block-paragraph\">Figure 1. Risk management process: Five steps to achieving a safe system of work.<\/p>\n\n\n\n<p class=\"has-link-color has-small-font-size wp-elements-45c379d64253992d7f2685af3d712952 wp-block-paragraph\">Hazard elimination should be a high priority. For example, trenchless technology can replace the need for excavation, except for launch pits and receiving pits; and this can avoid many of the risks associated with open drainage. It also reduces the risks posed by open excavation to the public and traffic.<\/p>\n\n\n\n<p class=\"has-link-color has-small-font-size wp-elements-9c92873d145f6d17b54ba6a3a088c82e wp-block-paragraph\"><strong>1.3.2 Safe Work Method Statement (SWMS)<\/strong><\/p>\n\n\n\n<p class=\"has-link-color has-small-font-size wp-elements-4a73af4934b0eb6bd4215b2c538e2843 wp-block-paragraph\">If the excavation work is or involves high-risk construction work, the contractor must prepare a PKKS before the high-risk construction work begins. The PKKS must:<\/p>\n\n\n\n<ul class=\"wp-block-list has-link-color has-small-font-size wp-elements-10cf1b87a1bec2c7ec0b9e39ca720eab\">\n<li>&nbsp;(a) identify the type of high-risk construction work being carried out;<\/li>\n\n\n\n<li>&nbsp;(b) determine the safety and health hazards, and risks arising from the work;<\/li>\n\n\n\n<li>&nbsp;(c) explain how the risk will be controlled;<\/li>\n\n\n\n<li>&nbsp;(d) explain how control measures will be implemented, monitored and reviewed; and<\/li>\n\n\n\n<li>&nbsp;(e) developed in consultation with workers and workers&#039; representatives who carry out high-risk construction work.<\/li>\n<\/ul>\n\n\n\n<p class=\"has-link-color has-small-font-size wp-elements-f3ed689b453f1207b2eb2cd1cc1fab67 wp-block-paragraph\">In certain circumstances, a single PKKS may be prepared to cover more than one high-risk construction work activity carried out at the worksite by the contractor and\/or subcontractor. For example, if there is:<\/p>\n\n\n\n<ul class=\"wp-block-list has-link-color has-small-font-size wp-elements-abf51297b7922b70d80802788357dd38\">\n<li>(a) the risk of a person falling more than three metres; and<\/li>\n\n\n\n<li>(b) trenches with a digging depth of more than 1.5 metres.<\/li>\n<\/ul>\n\n\n\n<p class=\"has-link-color has-small-font-size wp-elements-ca9ff55e41dde7cb77fc96d1239a3a92 wp-block-paragraph\">In this case, contractors or subcontractors can consult with each other and work together to prepare a single PKKS; or, they can prepare PKKS separately. If they choose to prepare separate PKKS, they must consult with each other to ensure that all PKKS are consistent and do not create additional unplanned risks in the workplace.<\/p>\n\n\n\n<p class=\"has-link-color has-small-font-size wp-elements-9046d39b6efa8a0f3da51414f38d4975 wp-block-paragraph\"><strong>1.3.3 Planning your work<\/strong><\/p>\n\n\n\n<p class=\"has-link-color has-small-font-size wp-elements-f1f00ceb28aec91ec21b614cd6850cfb wp-block-paragraph\">One of the important factors to consider at the planning stage is the type of soil to be excavated. Generally, all excavations, except very shallow ones, require support using trench sheeting.<\/p>\n\n\n\n<p class=\"has-link-color has-small-font-size wp-elements-e15b491506fd0d39d7edf5b30d1b1320 wp-block-paragraph\">Assessment by the excavation supervisor is essential to review the possibility of any changes in ground conditions and then revise working methods accordingly. Further guidance on general risk management processes can be found in the Guidelines for Hazard Identification, Risk Assessment and Risk Control (HIRARC).<\/p>\n\n\n\n<p class=\"has-link-color has-small-font-size wp-elements-2dc3801f547b294999d54b91c466d563 wp-block-paragraph\">The assessment by the excavation supervisor must be followed by a site investigation carried out (usually by the principal builder) during the planning process, and the following points should be considered:<\/p>\n\n\n\n<ul class=\"wp-block-list has-link-color has-small-font-size wp-elements-8f0faafea822183c8b4aeea8db2380eb\">\n<li class=\"has-small-font-size\">(a) underground utilities \u2013 including gas, water, sewerage, telecommunications, electricity, chemicals, fuels or refrigerants in pipes or conduits;<\/li>\n\n\n\n<li>(b) previous use of the site;<\/li>\n\n\n\n<li>(c) location of existing buildings and new structures;<\/li>\n\n\n\n<li>(d) results of soil investigations;<\/li>\n\n\n\n<li>(e) soil pollution;<\/li>\n\n\n\n<li>(f) water drainage (including underground), water table and soil type;<\/li>\n\n\n\n<li>(g) location of storage and disposal of dredged material;<\/li>\n\n\n\n<li>(h) methods of transportation, unloading and disposal routes, amount of working and storage space required;<\/li>\n\n\n\n<li>(i) the most suitable method for temporary support of excavation walls;<\/li>\n\n\n\n<li>(j) the number of people involved;<\/li>\n\n\n\n<li>(k) local weather conditions;<\/li>\n\n\n\n<li>(l) the dredging period will be left open; and<\/li>\n\n\n\n<li class=\"has-small-font-size\">(m) adequate emergency arrangements.<\/li>\n<\/ul>\n\n\n\n<p class=\"has-link-color has-small-font-size wp-elements-da6104ebb35353e6565f6281a6f56bb5 wp-block-paragraph\">The position of all existing underground utility installations, such as sewers, mains (water and gas) and cables (electrical and telecommunications) must be verified before work begins. Pipes or cables should be isolated before work begins.&nbsp;<\/p>\n\n\n\n<p class=\"has-link-color has-small-font-size wp-elements-6bfa99a116f38ae564c8174e45565d11 wp-block-paragraph\">If excavation work is required to repair mains (water and gas), piped services or cables (electrical or telecommunications) that serve the surrounding population, it is essential that effective communication is established and maintained between the excavation contractor and the neighbouring population throughout all stages of the project. If the work obstructs the main or emergency routes from the building, then egress arrangements must be made.<\/p>\n\n\n\n<p class=\"has-link-color has-small-font-size wp-elements-2d10563ff126b9245ab8b189a9acc1b4 wp-block-paragraph\">Once the site investigation and work plan is complete, meetings should be arranged with neighbouring residents so that any special arrangements can be communicated. Ongoing contact with local residents is an important element of the risk control strategy.<\/p>\n\n\n\n<p class=\"has-link-color has-small-font-size wp-elements-9628b35d3ee463b2116196e63a816d03 wp-block-paragraph\"><strong>1.3.4 Referring your employees<\/strong><\/p>\n\n\n\n<p class=\"has-link-color has-small-font-size wp-elements-1dd147cc4545358d60adb2564e77265b wp-block-paragraph\">Consultation with workers and safety and health representatives is required in every risk management process. Decisions about construction work and projects are usually made before workers are employed. As such, discussions with workers may not be possible at an early stage. However, it is important to discuss them as excavation work progresses.<\/p>\n\n\n\n<p class=\"has-link-color has-small-font-size wp-elements-4f971c52d33d82c8a5d70cc023779f8a wp-block-paragraph\"><strong>1.3.5 Consultation, cooperation and coordination with others who have obligations<\/strong><\/p>\n\n\n\n<p class=\"has-link-color has-small-font-size wp-elements-bce9c8ac01a07b29e46a7e3895c64d2a wp-block-paragraph\">Construction sites are often shared with multiple parties, such as civil engineers and contractors. People with overlapping responsibilities should exchange information about the risks associated with the excavation work, including any traffic and plant movements near the excavation area. They should work together in a coordinated manner so that all hazards\/risks are eliminated or minimized as far as is reasonably practicable. Consultation should include discussion of:<\/p>\n\n\n\n<ul class=\"wp-block-list has-link-color has-small-font-size wp-elements-f8737f661b03b6bc222f754097fafce6\">\n<li class=\"has-small-font-size\">(a) the nature and condition of the soil and working environment;<\/li>\n\n\n\n<li>(b) weather conditions;<\/li>\n\n\n\n<li>(c) the nature of work and other activities that may affect safety and health;<\/li>\n\n\n\n<li>(d) static and dynamic loads near the excavation;<\/li>\n\n\n\n<li>(e) interaction with other crafts;<\/li>\n\n\n\n<li>(f) site access;<\/li>\n\n\n\n<li>(g) PKKS;<\/li>\n\n\n\n<li>(h) management of surrounding vehicle traffic and ground vibration;<\/li>\n\n\n\n<li>(i) the type of equipment used for dredging work;<\/li>\n\n\n\n<li>(j) public safety;<\/li>\n\n\n\n<li>(k) existing utility services and their locations;<\/li>\n\n\n\n<li>(l) the dredging period will be left open;<\/li>\n\n\n\n<li>(m) adequate welfare provisions, and<\/li>\n\n\n\n<li class=\"has-small-font-size\">(n) procedures for dealing with emergencies.<\/li>\n<\/ul>\n\n\n\n<p class=\"has-link-color has-small-font-size wp-elements-743002c6f5e1fb353603e31413659f63 wp-block-paragraph\"><strong>Related issues<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list has-link-color has-small-font-size wp-elements-8c50165acb8f60cdefed6c669b5fb363\">\n<li><a href=\"https:\/\/dosh.gov.my\/wp-content\/uploads\/2025\/01\/Panduan-pemeriksaan-bahaya-kerja-pengorekan.pdf\" target=\"_blank\" rel=\"noreferrer noopener\">Guide to inspecting hazards in dredging work<\/a><\/li>\n\n\n\n<li><a href=\"https:\/\/dosh.gov.my\/index.php\/ms\/list-of-documents\/regulation-2-1\/guidelines\/building-construction-engineering-work\/2616-01-garis-panduan-kkp-kerja-penggorekkan-2017\" target=\"_blank\" rel=\"noreferrer noopener\">Guidelines for Occupational Safety and Health in the Construction Industry (Dredging Work) 2017<\/a><\/li>\n\n\n\n<li><a href=\"https:\/\/dosh.gov.my\/wp-content\/uploads\/2025\/01\/e-Buletin-Tapak-Selamat-Bil.-3-2015.pdf\" target=\"_blank\" rel=\"noreferrer noopener\">e-Bulletin: Safe Site No. 3\/2015<\/a><\/li>\n<\/ul>\n<\/div><\/div>\n<\/div><\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"","protected":false},"author":2,"featured_media":0,"parent":2079,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_lmt_disableupdate":"","_lmt_disable":"","footnotes":""},"class_list":["post-5761","page","type-page","status-publish","hentry"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.5 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Kerja Pengorekan - Portal Rasmi Jabatan Keselamatan Dan Kesihatan Pekerjaan<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/dosh.gov.my\/en\/keselamatan-tapak-bina\/kerja-pengorekan\/\" \/>\n<meta property=\"og:locale\" content=\"en_GB\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Kerja Pengorekan - Portal Rasmi Jabatan Keselamatan Dan Kesihatan Pekerjaan\" \/>\n<meta property=\"og:url\" content=\"https:\/\/dosh.gov.my\/en\/keselamatan-tapak-bina\/kerja-pengorekan\/\" \/>\n<meta property=\"og:site_name\" content=\"Portal Rasmi Jabatan Keselamatan Dan Kesihatan Pekerjaan\" \/>\n<meta property=\"article:modified_time\" content=\"2025-02-20T13:59:06+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/dosh.gov.my\/wp-content\/uploads\/2025\/01\/image-3.png\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Estimated reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"8 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/dosh.gov.my\/keselamatan-tapak-bina\/kerja-pengorekan\/\",\"url\":\"https:\/\/dosh.gov.my\/keselamatan-tapak-bina\/kerja-pengorekan\/\",\"name\":\"Kerja Pengorekan - Portal Rasmi Jabatan Keselamatan Dan Kesihatan Pekerjaan\",\"isPartOf\":{\"@id\":\"https:\/\/dosh.gov.my\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/dosh.gov.my\/keselamatan-tapak-bina\/kerja-pengorekan\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/dosh.gov.my\/keselamatan-tapak-bina\/kerja-pengorekan\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/dosh.gov.my\/wp-content\/uploads\/2025\/01\/image-3.png\",\"datePublished\":\"2025-01-19T07:41:34+00:00\",\"dateModified\":\"2025-02-20T13:59:06+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/dosh.gov.my\/keselamatan-tapak-bina\/kerja-pengorekan\/#breadcrumb\"},\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/dosh.gov.my\/keselamatan-tapak-bina\/kerja-pengorekan\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\/\/dosh.gov.my\/keselamatan-tapak-bina\/kerja-pengorekan\/#primaryimage\",\"url\":\"https:\/\/dosh.gov.my\/wp-content\/uploads\/2025\/01\/image-3.png\",\"contentUrl\":\"https:\/\/dosh.gov.my\/wp-content\/uploads\/2025\/01\/image-3.png\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/dosh.gov.my\/keselamatan-tapak-bina\/kerja-pengorekan\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Utama\",\"item\":\"https:\/\/dosh.gov.my\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Keselamatan Tapak Bina\",\"item\":\"https:\/\/dosh.gov.my\/keselamatan-tapak-bina\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Kerja Pengorekan\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/dosh.gov.my\/#website\",\"url\":\"https:\/\/dosh.gov.my\/\",\"name\":\"Portal Rasmi Jabatan Keselamatan Dan Kesihatan Pekerjaan\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\/\/dosh.gov.my\/#organization\"},\"alternateName\":\"JKKP - DOSH\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/dosh.gov.my\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-GB\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/dosh.gov.my\/#organization\",\"name\":\"Portal Rasmi Jabatan Keselamatan Dan Kesihatan Pekerjaan\",\"url\":\"https:\/\/dosh.gov.my\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\/\/dosh.gov.my\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/dosh.gov.my\/wp-content\/uploads\/2025\/02\/Logo-Portal-Rasmi-JKKP-my.png\",\"contentUrl\":\"https:\/\/dosh.gov.my\/wp-content\/uploads\/2025\/02\/Logo-Portal-Rasmi-JKKP-my.png\",\"width\":1067,\"height\":102,\"caption\":\"Portal Rasmi Jabatan Keselamatan Dan Kesihatan Pekerjaan\"},\"image\":{\"@id\":\"https:\/\/dosh.gov.my\/#\/schema\/logo\/image\/\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Kerja Pengorekan - Portal Rasmi Jabatan Keselamatan Dan Kesihatan Pekerjaan","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/dosh.gov.my\/en\/keselamatan-tapak-bina\/kerja-pengorekan\/","og_locale":"en_GB","og_type":"article","og_title":"Kerja Pengorekan - Portal Rasmi Jabatan Keselamatan Dan Kesihatan Pekerjaan","og_url":"https:\/\/dosh.gov.my\/en\/keselamatan-tapak-bina\/kerja-pengorekan\/","og_site_name":"Portal Rasmi Jabatan Keselamatan Dan Kesihatan Pekerjaan","article_modified_time":"2025-02-20T13:59:06+00:00","og_image":[{"url":"https:\/\/dosh.gov.my\/wp-content\/uploads\/2025\/01\/image-3.png","type":"","width":"","height":""}],"twitter_card":"summary_large_image","twitter_misc":{"Estimated reading time":"8 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/dosh.gov.my\/keselamatan-tapak-bina\/kerja-pengorekan\/","url":"https:\/\/dosh.gov.my\/keselamatan-tapak-bina\/kerja-pengorekan\/","name":"Kerja Pengorekan - Portal Rasmi Jabatan Keselamatan Dan Kesihatan Pekerjaan","isPartOf":{"@id":"https:\/\/dosh.gov.my\/#website"},"primaryImageOfPage":{"@id":"https:\/\/dosh.gov.my\/keselamatan-tapak-bina\/kerja-pengorekan\/#primaryimage"},"image":{"@id":"https:\/\/dosh.gov.my\/keselamatan-tapak-bina\/kerja-pengorekan\/#primaryimage"},"thumbnailUrl":"https:\/\/dosh.gov.my\/wp-content\/uploads\/2025\/01\/image-3.png","datePublished":"2025-01-19T07:41:34+00:00","dateModified":"2025-02-20T13:59:06+00:00","breadcrumb":{"@id":"https:\/\/dosh.gov.my\/keselamatan-tapak-bina\/kerja-pengorekan\/#breadcrumb"},"inLanguage":"en-GB","potentialAction":[{"@type":"ReadAction","target":["https:\/\/dosh.gov.my\/keselamatan-tapak-bina\/kerja-pengorekan\/"]}]},{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/dosh.gov.my\/keselamatan-tapak-bina\/kerja-pengorekan\/#primaryimage","url":"https:\/\/dosh.gov.my\/wp-content\/uploads\/2025\/01\/image-3.png","contentUrl":"https:\/\/dosh.gov.my\/wp-content\/uploads\/2025\/01\/image-3.png"},{"@type":"BreadcrumbList","@id":"https:\/\/dosh.gov.my\/keselamatan-tapak-bina\/kerja-pengorekan\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Utama","item":"https:\/\/dosh.gov.my\/"},{"@type":"ListItem","position":2,"name":"Keselamatan Tapak Bina","item":"https:\/\/dosh.gov.my\/keselamatan-tapak-bina\/"},{"@type":"ListItem","position":3,"name":"Kerja Pengorekan"}]},{"@type":"WebSite","@id":"https:\/\/dosh.gov.my\/#website","url":"https:\/\/dosh.gov.my\/","name":"Official Portal of the Department of Occupational Safety and Health","description":"","publisher":{"@id":"https:\/\/dosh.gov.my\/#organization"},"alternateName":"JKKP - DOSH","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/dosh.gov.my\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-GB"},{"@type":"Organization","@id":"https:\/\/dosh.gov.my\/#organization","name":"Official Portal of the Department of Occupational Safety and Health","url":"https:\/\/dosh.gov.my\/","logo":{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/dosh.gov.my\/#\/schema\/logo\/image\/","url":"https:\/\/dosh.gov.my\/wp-content\/uploads\/2025\/02\/Logo-Portal-Rasmi-JKKP-my.png","contentUrl":"https:\/\/dosh.gov.my\/wp-content\/uploads\/2025\/02\/Logo-Portal-Rasmi-JKKP-my.png","width":1067,"height":102,"caption":"Portal Rasmi Jabatan Keselamatan Dan Kesihatan Pekerjaan"},"image":{"@id":"https:\/\/dosh.gov.my\/#\/schema\/logo\/image\/"}}]}},"_links":{"self":[{"href":"https:\/\/dosh.gov.my\/en\/wp-json\/wp\/v2\/pages\/5761","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/dosh.gov.my\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/dosh.gov.my\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/dosh.gov.my\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/dosh.gov.my\/en\/wp-json\/wp\/v2\/comments?post=5761"}],"version-history":[{"count":25,"href":"https:\/\/dosh.gov.my\/en\/wp-json\/wp\/v2\/pages\/5761\/revisions"}],"predecessor-version":[{"id":10075,"href":"https:\/\/dosh.gov.my\/en\/wp-json\/wp\/v2\/pages\/5761\/revisions\/10075"}],"up":[{"embeddable":true,"href":"https:\/\/dosh.gov.my\/en\/wp-json\/wp\/v2\/pages\/2079"}],"wp:attachment":[{"href":"https:\/\/dosh.gov.my\/en\/wp-json\/wp\/v2\/media?parent=5761"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}